Wingstop filing lists a Cibolo Valley Drive location
A state filing registered October 1 lists a Wingstop tenant improvement at 635 Cibolo Valley Drive, Suite 160. Estimated construction dates are December 10, 2026–March 12, 2027; an opening date is unconfirmed.
Timing: Estimated construction: December 10, 2026–March 12, 2027
A filing or a planning record is not proof that anything is open or funded. CiboloWatch publishes the record and the date it was verified, and nothing beyond it.